top of page


On-Site Inspection of a Metal Recycling Plant in Germany
AKSA Process Engineering conducted an on-site inspection of a metal recycling line installed at a facility in Germany. The system, comprising 8 Eddy Current Separators and 2 Stainless Steel Separators, was evaluated under real operating conditions. Separation quality, process stability, and operational continuity were verified, confirming that the line delivers high efficiency, reliable performance, and sustainable metal recovery.
AKSA MAGNET
6 days ago2 min read


EFW Plant Visit in the UK
Today, the AKSA Process team visited an Energy-from-Waste (EFW) facility in the United Kingdom to conduct an on-site technical review of the plant’s key operational stages. During the visit, we examined the waste reception line, combustion process, bottom-ash metal recovery systems, and the overall energy-generation flow. Together with the plant’s engineering team, we evaluated the current separation performance, metal-recovery efficiency, and maintenance-operations constrain
AKSA MAGNET
Jan 142 min read
bottom of page
